May 10, 2015

Town Board Meetings

Kinder Morgan and Tennessee Gas pipeline companies propose to build a 36 inch diameter gas pipeline through Schodack. The pressure in these pipelines will be 1460 pounds per square inch, which is more than twice the volume and pressure in the existing 3 pipelines that go through our town. A large 90,000 horsepower compressor station, to push the gas along the pipeline, with three Titan 250 gas turbines is proposed on the Schodack/Nassau border (the existing Malden Bridge compressor station is a little over 10,000 HP). This is an industrial structure that emits noise and light 24/7 and off-gases periodically to regulate the pressure. The proposed pipeline would carry fracked gas from Pennsylvania through Schodack, Nassau and Stephentown and end in Dracut, Massachusetts. In September 2015 Kinder Morgan plans to file its application for approval to build this pipeline from the Federal Energy Regulatory Commission (FERC).

This week are the town board meetings with Schodack (Thursday) and Nassau (Wednesday) where we hope both towns will pass strong resolutions opposing the pipeline. If you can, try to attend these meeting so our town officials realize how important this is to us.

Submitted by Lisa Zimmerman

Stop NY Fracked Gas Pipeline


Town Boards

Schodack

THURSDAY May 14 2015 7pm

Regular Meeting Draft Agenda, when available
Public Hearing: 7:15 pm re Amending the Zoning Law to provide regulation of Solar Energy systems

Nassau
 THURSDAY May 14, 2015 - Monthly Town Board meeting starts at 7:00PM.

Proposed Gas Pipeline Information

Expansion of the existing Tennessee Gas Pipeline is proposed in our area.  This page will be the place we try to consolidate all the information we have on the project.

No comments:

Post a Comment

Join the conversation.