Showing posts with label #Pipline. Show all posts
Showing posts with label #Pipline. Show all posts

February 24, 2016

Public Meetings

Two meetings are scheduled this week--
SNYFGP will continue its efforts to oppose and stop the Northeast Energy Direct pipeline and its compressor stations.

Stop the NY Fracked Gas Pipeline meeting at the First Reformed Church of Bethlehem38 Church Road, Selkirk.Thursday, February 25, from 6-8 pm. 

After our recent successes, we will plan our efforts toward engaging more elected officials, fundraising, outreach, etc. This comes off the heels of the well attended public forum in January and the strong anti-pipeline resolution of the Bethlehem Town Board. Other towns are moving forward too--thanks to all of your efforts.  

Next week SNYFGP meets in Schodack at the Swartz Senior Citizen Center near the intersection of Rte. 150 and Rte. 9 & 20  March 1st at 6:30pm.

All are invited. Please invite friends and family to one of these meeting. 

May 10, 2015

Town Board Meetings

Kinder Morgan and Tennessee Gas pipeline companies propose to build a 36 inch diameter gas pipeline through Schodack. The pressure in these pipelines will be 1460 pounds per square inch, which is more than twice the volume and pressure in the existing 3 pipelines that go through our town. A large 90,000 horsepower compressor station, to push the gas along the pipeline, with three Titan 250 gas turbines is proposed on the Schodack/Nassau border (the existing Malden Bridge compressor station is a little over 10,000 HP). This is an industrial structure that emits noise and light 24/7 and off-gases periodically to regulate the pressure. The proposed pipeline would carry fracked gas from Pennsylvania through Schodack, Nassau and Stephentown and end in Dracut, Massachusetts. In September 2015 Kinder Morgan plans to file its application for approval to build this pipeline from the Federal Energy Regulatory Commission (FERC).

This week are the town board meetings with Schodack (Thursday) and Nassau (Wednesday) where we hope both towns will pass strong resolutions opposing the pipeline. If you can, try to attend these meeting so our town officials realize how important this is to us.

Submitted by Lisa Zimmerman

Stop NY Fracked Gas Pipeline


Town Boards

Schodack

THURSDAY May 14 2015 7pm

Regular Meeting Draft Agenda, when available
Public Hearing: 7:15 pm re Amending the Zoning Law to provide regulation of Solar Energy systems

Nassau
 THURSDAY May 14, 2015 - Monthly Town Board meeting starts at 7:00PM.

Proposed Gas Pipeline Information

Expansion of the existing Tennessee Gas Pipeline is proposed in our area.  This page will be the place we try to consolidate all the information we have on the project.

March 29, 2015

Public Notice: organizational meeting

Public notice to Schodack and Nassau residents,
Plans call for the 36-inch, pressurized pipeline to travel east from Wright in an existing Kinder Morgan right of way through Knox, Berne, New Scotland and Bethlehem, before crossing beneath the Hudson River at Schodack, Rensselaer County. TU 3/27
On Thursday, 4/2/15 at 7 PM, I am holding another organizational meeting in regards to opposition to the proposed NED pipeline and compressor station in our towns. 

It will be held at the Senior center for the aging on rte 150 on the right just north of the intersection of Rt 20 and 150 if going north. Feel free to invite friends and neighbors. The past meeting we discussed our concerns about the pipeline, a general plan for upcoming public meetings, informing the public and voicing our opposition to our government leaders. 

Our last meeting was a success with about 30+ in attendance. This time, we will work on forming smaller committees to address specific tasks, planning our strategy for the upcoming Kinder Morgan meeting April 13 at Green Meadow school 6-8 PM, sign letters to our elected officials and have an informational letter to distribute to Schodack residents. We also need to start planning our public forum on 5/5 /15 and how we will organize help with this meeting.

Thank you, 
Lisa and Bill Zimmerman

 April 13: Schodack, NY  Green Meadow Elementary School; 234 Schuurman Rd., Castleton-on-Hudson, NY 12033  **All Open Houses are 6pm – 8pm