Showing posts with label #Fracked Gas Pipeline. Show all posts
Showing posts with label #Fracked Gas Pipeline. Show all posts

February 9, 2016

Stop NY Fracked Gas Pipeline

Subject: Deny Kinder Morgan/Tennessee Gas Pipeline right to survey or rescind survey permission
A CRITICAL MEASURE TO DEFEAT THIS PIPELINE IS TO SEND CERTIFIED LETTER TO KM/TGP TO DENY SURVEYS OR TO RESCIND SURVEY PERMISSION. EVEN NOW.

SEE SAMPLE LETTER SNYFGP WEB PAGE: STOPNYPIPELINE.ORG Here is the contact info for the KM land agent in Albany, Rensselaer and Schoharie County, NY: Steve Martin (603) 566 – 9207

steve_martin2@kindermorgan.com
Tennessee Gas Pipeline
Attn: Steve Martin
1615 Suffield St.
Agawam, MA 01001

November 6, 2015

Call to action

On Wednesday, October 28th, Rensselaer County Chairman Stan Brownell and Vice Chairman Alex Shannon proposed another bill to protect drinking water , and we understand that they intend to bring it to a vote on November 10th.

The language of the bill reflects much improvement over the “eminent domain” version, and we now have a basis for moving forward to the development of a bill acceptable to us, the residents. However, it needs a lot of improvement. In fact, when comparing this bill to that which Legislator Alex Shannon and others introduced in August, this bill represents a significant step away from that bill's protections.

For example: The bill covers residents living within ¼ mile from a blast; the August bill protected residents living one mile from a blast: a 75% reduction in those protected. While we could live with covering residents living within ½ mile, ¼ mile – only 1320 feet -- is too small a radius.

June 16, 2015

Stop NY Fracked Gas Pipeline

Meeting tomorrow 7-9 PM at the senior center in Schodack.  about the high pressure, fracked gas pipeline and compressor station proposed to be located in Schodack

Sponsored by: Stop NY Fracked Gas Pipeline. If you want to learn more, you can visit www.stopnypipeline.org

For further information contact: John Serio, 518-733-0095
Email: Lisa Zimmerman at lisaz11659@gmail.com


February 1, 2015

A pipeline through Schodack?

There is a public information session coming up, hosted by the company Kinder Morgan, on Monday, February 9, from 6 - 8 pm at Green Meadow Elementary.  The original plan for expansion was along the existing pipeline route, and that crosses through Schodack from west to east.  Now the company wants to lay the new pipe along a power line right-of-way, and with this alternative plan they are planning to build a new compression station in Rensselaer County, quite possibly in Schodack.  The same company has a compression station along Route 66 in Chatham already. The company's filed plans show that the compresssion station could be in the area between Routes 9 and 20 (south of the split) kind of near Shufelt Rd.

Watch this video for more information.

MONDAY — FEBRUARY 9, 2015 — Castleton-On-Hudson, NY
NEW LOCATION (formerly Nassau, NY)
February 9: Schodack, NY
Green Meadow Elementary School Cafeteria
234 Schuurman Road, Castleton-On-Hudson, NY 12033

What could possibly go wrong? Read more...


http://thescene-thescene.blogspot.com/p/advertise.html

January 7, 2015

Public Forum


Public Forum  on Proposed Fracked Gas Pipeline
   Through Rensselaer County, NY
Saturday, January 10, 2015
2 p.m. St. Mary’s Church, Route 20 Nassau, NY
Becky Meier a co-founder of “Stop NY Fracked Gas Pipeline” will narrate a Power Point Presentation about a proposed high-pressure fracked gas pipeline/compressor station in Rensselaer County to be routed along the powerlines.The environmental impact, health concerns, and the rights of communities will be discussed. The proposed pipeline and compressor station would affect the towns of Schodack, Nassau, and Stephentown, NY, and continue into Hancock, Massachusetts. Both parking and event itself are free of charge.
For more information:

 Sandy Nathan: snathanwrites@gmail.com  Sponsored by: Stop NY Fracked Gas Pipeline



http://thescene-thescene.blogspot.com/p/advertise.html